Category Archives: Case Study

Process Chiller Optimisation – Confidential Client Dublin

Building Management Systems

Commissioning of the Process (Glycol) Chillers @ Confidential Client Dublin was carried out in early 2018 , at that time it was necessary to place a heat load on the system to prevent the chillers going into fault and maintain reliability . This heat load was provided via the Tempered Glycol System which in turn […]

Carlow Arts Centre – BMS Energy Upgrade

Another BMS system energy upgrade executed by Subnet for Carlow Arts Centre with Mastertech Services. This BMS energy upgrade will assist in maximising building controls performance whilst minimising building energy costs. This is achieved by accurately monitoring key building Utilities… electrical, Water & Gas Usage in line with EN52120. Retro fit from old Cylon to […]

BMS system upgrade executed for LIDL Distribution Centre – Mullingar

Lidl Distribution Centre

This BMS energy upgrade will assist in maximising building controls performance whilst minimising building energy costs. This is achieved by accurately monitoring key building Utilities… electrical, Water & Gas Usage in line with EN15232. Retro fit from old TAC to Siemens Desigo & PXC range of BMS controllers. 18 no. PXC Controllers monitoring & Controlling […]